Author: Site Editor Publish Time: 17-10-2026 Origin: Site
Many users think that a new reducer can be put into full production immediately upon arrival, refueling, and powering on. In fact, this is the most common misunderstanding in There are microscopic knife marks and assembly errors on the surfaces of the friction pairs such as gear pairs, bearings, and cycloidal pinwheels of the new machine. During the running-in process, a large amount of metal micro-shavings will be peeled off and mixed into the oil pool. If running at full load without completing running-in as required, the tooth surface is prone to early pitting corrosion and gluing, which directly affects the service life. The common practice in the industry is that for new or overhauled reducers, reducer maintenance . the first oil change of the reducer must be completed within 200 to 300 hours of cumulative operation . This is also clearly required in the instructions for use of GB 5903 series industrial gear oil.
Before officially starting the machine, do four things: confirm that the anchor bolts and coupling bolts are tightened in diagonal order; check that the vent cap (breathable plug) is unobstructed to prevent the increase in internal pressure of the box from damaging the oil seal; add the specified grade of gear oil according to the instructions, and keep the oil level at 1/2 to 2/3 of the oil mark; manually turn the machine to confirm that the rotation is flexible and there is no jamming. Then follow the sequence of 'Jog to confirm steering → run continuously for 2 hours without load'. During the test run, monitor whether the meshing sound is uniform, whether there are any abnormal noises and impact sounds from the reducer , and observe whether the temperatures of the box and bearing seat are stable, and check whether there is leakage at the shaft seal and end cover.
After the no-load is normal, it will enter the light-load running-in, and the load will be increased step by step. Do not reach the full load in one step. The following table gives commonly used graded loading running-in schemes:
stage | load ratio | Running time | Observation points |
|---|---|---|---|
1 | No load | 2 hours | Steering, abnormal noise, leakage |
2 | 25% rated load | 2 to 4 hours | Temperature rise curve, vibration |
3 | 50% rated load | to a total of 100 hours | Oil temperature, current |
4 | 75%~100% rated load | to a total of 200 to 300 hours | Change oil after comprehensive re-inspection |
Judgment criteria can be referenced: the oil pool temperature of the gear reducer does not exceed 80°C (worm gear model does not exceed 90°C), and the bearing temperature rise does not exceed 40°C. If there is a sudden rise in temperature, intensified vibration or metal friction sound due to unknown reasons for the reducer's heating , the machine should be stopped immediately for investigation. It is strictly prohibited to continue running in while sick. The current on the drive side of the gear reduction motor should also be monitored throughout the process. Large current fluctuations often mean abnormal meshing or load jamming.
After the running-in is completed, stop the machine and let it stand for 10 to 15 minutes. Drain the oil while the oil temperature is in a hot state of 40 to 60°C. The old oil should be drained cleanly and completely. If the magnetic pad on the oil drain plug absorbs a large amount of iron filings or metal blocks, the machine must be disassembled and inspected before being put into operation; only a small amount of powder is normal wear and tear. After draining out the old oil, add about half the amount of cleaning oil and run it without load for 3 to 5 minutes to flush the box. Drain it again, and then filter and add new oil with an 80 to 100 mesh filter. Regarding the type of reducer lubricating oil : closed gear transmissions such as hard-tooth surface reducers and planetary reducers generally use load-bearing L-CKC or heavy-duty L-CKD industrial gear oil, and worm gear reducers use L-CKE worm gear oil. Mixing different brands is strictly prohibited.
The first oil change is not the end point: a second oil change should be carried out about 3 months after it is put into use to completely remove residual impurities during the running-in period; thereafter, the mineral gear oil should be replaced every 3000 to 6000 hours or 6 to 12 months under normal working conditions. The cycle should be shortened by half in harsh working conditions of high temperature, dust, and 24-hour continuous operation. Daily inspections adhere to 'first look at the oil level and color, secondly listen to the sound, thirdly feel the temperature, and fourthly check for leaks.' If the oil turns black, emulsifies and foams, or contains metal particles, change the oil immediately. Standardized running-in period management is a link with a very prominent input-output ratio in reducer maintenance . Doing these 200 hours well can lay the foundation for stable operation for thousands of hours in the future.
If you encounter specific problems during the running-in, oil change or maintenance of a new reducer, please contact Hangzhou Weigao Transmission . As a professional reducer manufacturer and Hangzhou reducer manufacturer , we provide a full range of product lines such as cycloidal pinwheel reducers, hard tooth surface gear reducers, worm gear reducers, gear reduction motors, etc., and provide customers with free Selection calculation and maintenance guidance services.
Offshore Wind Vessel Gearbox Market 2027: Crane and Winch Drive Demand
Lubrication and maintenance characteristics of B series industrial gearboxes
What are the common misunderstandings in B series gearbox maintenance?
Apron Feeder Gearbox Selection: Chain Pull, Shock Load and Service Factor
How does the R series helical gear reducer perform in a strong vibration environment Selection
Pneumatic Conveying Gearbox Market 2027: Blower, Airlock and Screw Drive Demand
Pellet Mill Gearbox Selection: Ring Die Torque, Thermal Rating and VFD Restart
Is there any way to reduce the parallelism error of the reducer?
Food and Beverage Gearbox Market 2027: Renovation Demand and Mixer Sizing
Marine Deck Winch Gearbox Selection: Drum Torque, Duty Class and Holding Brake
What specific damage will reversal with load cause to the BWY27-59-4KW cycloidal pinwheel reducer?
How to avoid XLED32-841-0.37KW cycloidal pinwheel reducer with load reversal
Desalination Plant Gearbox Market 2027: SWRO Pump Drive Demand
What are the common problems with NGW42-25 planetary reducer base welding?
What kind of noise will the reducer produce if the box manufacturing accuracy is not up to standard?
Slewing Drive Solar Tracker Selection: Wind Load and Holding Torque
Which is more efficient, cycloidal pinwheel reducer or worm gear reducer?