Author: Weigao Transmission Publish Time: 24-09-2021 Origin: 威高传动
All machines have trial run time.This time is used to detect whether there is a problem with the equipment that needs to be corrected, which is the so-called run-in period.It is necessary to ensure the normal operation of the reducer without problems, and it is also the guarantee for the efficient and long-term stable operation of the reducer in the future.
1. Smoothness
Due to the small running interval of the parts of the new device and the factors of the device itself, smooth oil (grease) is not easy to form a symmetrical oil film on the surface to prevent damage.Make sure the appearance is not too harsh, causing early severe wear to the part.Severe cases can even cause scratches on the outside.
2. Rapid wear
Because the contact area of the mating surface is small when the new reducer parts are processed, installed and adjusted, the applied torque is relatively large.During the operation of the reducer, the concave and convex parts outside the parts fit and conflict with each other, and the worn metal debris continues to participate in the conflict as abrasives, which accelerates the wear of the mating surfaces of the parts.Therefore, during the running-in period, it simply constitutes the wear of parts, and the wear speed is too fast.At this time, if it is overloaded, it may damage the parts and cause problems.
3. Leakage phenomenon
Due to the looseness, vibration and temperature rise of the reducer, the sealing surface of the reducer and the pipe joint will leak; some casting defects are not easy to find when the equipment is debugged, but due to the vibration and shock during operation, these problems manifest as oil spill.Therefore, leaks can also occur during break-in.
4. Looseness occurs
There may be some variance in the shape and degree of fit of newly delivered parts.At the beginning of application, the originally fastened parts become loose due to the impact, vibration and other alternating loads, as well as the influence of heat, deformation and other factors, coupled with rapid wear and other reasons.
The above work is completed under the condition of trial operation and running-in of the reducer, which is also a kind of maintenance for the reducer and plays a very good role in the long-term operation of the reducer.
Offshore Wind Vessel Gearbox Market 2027: Crane and Winch Drive Demand
Lubrication and maintenance characteristics of B series industrial gearboxes
What are the common misunderstandings in B series gearbox maintenance?
Apron Feeder Gearbox Selection: Chain Pull, Shock Load and Service Factor
How does the R series helical gear reducer perform in a strong vibration environment Selection
Pneumatic Conveying Gearbox Market 2027: Blower, Airlock and Screw Drive Demand
Pellet Mill Gearbox Selection: Ring Die Torque, Thermal Rating and VFD Restart
Is there any way to reduce the parallelism error of the reducer?
Food and Beverage Gearbox Market 2027: Renovation Demand and Mixer Sizing
Marine Deck Winch Gearbox Selection: Drum Torque, Duty Class and Holding Brake
What specific damage will reversal with load cause to the BWY27-59-4KW cycloidal pinwheel reducer?
How to avoid XLED32-841-0.37KW cycloidal pinwheel reducer with load reversal
Desalination Plant Gearbox Market 2027: SWRO Pump Drive Demand
What are the common problems with NGW42-25 planetary reducer base welding?
What kind of noise will the reducer produce if the box manufacturing accuracy is not up to standard?
Slewing Drive Solar Tracker Selection: Wind Load and Holding Torque
Which is more efficient, cycloidal pinwheel reducer or worm gear reducer?