Industrial gearbox installation and trial operation acceptance: alignment, tightening and trial operation determination - Hangzhou Weigao Transmission

Author: Site Editor     Publish Time: 16-10-2026      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

The lifespan of the same industrial gearbox installed on two production lines may be more than doubled. The difference is often not in the product itself, but in the installation and first test run. Insufficient installation accuracy will cause gears to be overloaded and bearings to be fatigued in advance; if abnormalities are not caught during the test run, small problems will quickly magnify into broken teeth and burned bearings after loading. This article explains the judgment method in the order of installation, commissioning and acceptance.

Three things you must confirm before installation

  • Foundation and embedded parts : The strength of the concrete foundation shall not be less than C25, the surface flatness deviation shall be within 2mm/m, and the anchor bolt position deviation shall not exceed ±5mm;

  • Model and accompanying documents: Check whether the model, speed ratio, and rated torque on the nameplate are consistent with the design, and archive the installation manual for future reference;

  • Lubricating oil and oil level : Add the specified grade of gear oil (usually ISO VG220 or VG320) according to the manual. The oil level should be near the center line of the oil mark when shutting down. If it is too high, it will aggravate the oil churning and heat, and if it is too low, the oil film will be insufficient.

Alignment and tightening during reducer installation

Measure the level first. Use a level with an accuracy of 0.02mm/m to measure the longitudinal, transverse and axial end surfaces of the box base, and control the deviation within 0.05mm/m ; the pads should be arranged neatly and closely fit the base, and are not allowed to be suspended.

Then do the shaft system alignment. Use a laser alignment instrument or dial indicator to detect the coaxiality between the input shaft and the motor shaft, the output shaft and the load end. The radial deviation should be controlled within 0.05mm, and the angular deviation should not exceed 0.1° . The coupling must reserve a thermal expansion gap; when using a sprocket or pulley for external transmission, the radial load of the reducer must be calculated . The additional cantilever load caused by excessive tension is a common cause of output shaft breakage.

Tightening is divided into three times according to the torque-angle method: pre-tightening 30% → 70% → 100%. For example, the final tightening torque of grade 8.8 M24 bolts is about 640N·m (subject to the manual). After 24 hours of operation, the anchor bolts must be retightened . This step is often skipped, but it is the direct source of box deformation and gear eccentric load.

No-load test run: continuous operation after step speed increase

Turn the car to confirm that the rotation is flexible and then jog three times to confirm that the steering is consistent with the housing mark (no more than 3 seconds each time), and then enter the no-load test run: start at 25% of the rated speed, increase step by step in 25% increments, each gear is about 30 minutes, and run continuously for no less than 2 hours after reaching the rated speed, and record a set of data every 30 minutes.

Test items

Reference limits

Common reasons for exceeding the standard

Bearing temperature

Not exceeding 80℃, temperature rise not exceeding 40K

Insufficient lubrication and excessive preload

Oil pool temperature

Within 80℃, no more climbing

Oil level is too high and viscosity does not match

Vibration intensity

Generally no more than 4.5mm/s, precision models no more than 2.8mm/s

Loose feet and poor alignment

Noise (from 1 meter)

No more than 85dB(A), uniform sound

Tooth side clearance is too small, bearing damage

Sealing part

Allows a very slight oil film, no dripping

The oil seal is deflected and the breathable cap is clogged

If the temperature continues to rise or the reducer makes abnormal noise during the no-load stage , the machine should be shut down immediately for investigation - loading unqualified equipment under no load will only accelerate damage.

Load test: 25% → 50% → 75% → 100% graded loading

Each load can run stably for more than 30 minutes, and full load can run continuously for no less than 2 hours. Focus on three things: whether the temperature gradually stabilizes instead of continuing to climb; whether the vibration increases significantly with the load (sudden changes lead to poor alignment or gear bias); whether the current is stable and the fluctuation should be within ±5%. After stopping the machine, re-measure the tooth side clearance and bearing clearance according to the drawings. If necessary, use the coloring method to confirm the contact spots (not less than 60% in the tooth length direction and not less than 45% in the tooth height direction).

Three types of exception handling during test runs

  1. Vibration exceeds the standard: first check whether the pre-tightening force of the anchor bolts is attenuated, and then recheck the alignment accuracy; if the meshing frequency component is prominent, stop the machine and adjust the gear meshing parameters;

  2. Abnormal temperature rise: If the temperature rise exceeds 10℃ within half an hour, stop the machine and check the oil quantity, oil quality and bearing preload;

  3. Leakage: First check the oil level and breather cap, and then confirm whether the oil seal installation direction and lip are damaged.

The connection between acceptance records and subsequent reducer maintenance

Fill in the acceptance form item by item for levelness, coaxiality, bolt torque, and temperature, vibration, noise, and current under each load level. If any item is not up to standard, readjust it and re-inspect it. These data are also the baseline for subsequent maintenance: after the first operation of about 500 hours, replace the running-in oil and clean the box. After that, the oil change cycle is determined according to the working conditions. The alignment and side clearance are re-tested every quarter. When there is a deviation trend, maintenance is arranged in advance. Most reasons for the reducer’s heating and early broken teeth can be discovered at this stage.

The judgment standards are slightly different in each manual. For non-standard working conditions or large units, it is recommended to refer to the manufacturer's technical documents. If you are supporting or replacing industrial gearboxes for production lines , please feel free to consult Hangzhou Weigao Transmission: We provide cycloidal pinwheel reducers, hardened cylindrical gear reducers, worm gear reducers, planetary reducers and various gear reduction motors. As a reducer manufacturer with many years of industry experience and a Hangzhou reducer manufacturer , we can provide free Selection calculations, imported brand model comparisons and reducer Selection consultation , and engineers will issue plans and quotations within 24 hours.

Latest News

WeiGao Transmission

Weigao Gear Reducer is an alliance group company that integrates research and development, production, sales, and service

+86 400 801 9158

Email: sales@wgt.net.cn;wgt.net.cn@gmail.com
Tel:+86571 85023000

WEIGAO REDUCER

FEEDBACK