Home / News / How to adjust the clearance of the bearings of the TP series flat enveloping toroidal worm reducer

How to adjust the clearance of the bearings of the TP series flat enveloping toroidal worm reducer

Author: Site Editor     Publish Time: 21-10-2026      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
How to adjust the clearance of the bearings of the TP series flat enveloping toroidal worm reducer

1. Safety tips before adjustment

It is strictly forbidden to dismantle the original structure of new equipment at will. Before on-site adjustment, the power must be cut off, the lubricating oil in the box must be drained, and the original marks of the shaft end and meshing position must be made.

When the radial clearance exceeds 0.25mm after the bearing is worn, replace the bearing directly with a new one without any adjustment.

2. Clearance standard reference

According to JB/T9051 industry standard, the axial clearance of TP series bearings must meet the following range:

3. Step-by-step adjustment operation

‌1. Worm shaft bearing clearance adjustment‌

The worm shaft mostly adopts the structure of "double tapered roller bearings fixed face to face + cylindrical roller bearing at the other end swimming". First assemble the worm shaft in place, use a depth gauge to measure the depth difference from the end surface of the bearing outer ring to the joint surface of the end cover, and calculate the total thickness of the required gasket.

Add a flat grinding adjustment shim between the bearing end cover and the box joint surface, gradually increase or decrease the thickness of the shim, and manually turn the worm while adjusting until the worm rotates flexibly without stuck or obvious axial movement.

Use a feeler gauge to retest the fit between the bearing end face and the shaft shoulder. The 0.02mm feeler gauge must not be inserted to ensure that the bearing is completely close to the positioning surface.

‌2. Worm gear shaft bearing clearance adjustment‌

Both ends of the worm gear are tapered roller bearings. Coarse adjustment is made through a round nut with a locking screw at the end of the shaft. Turn the nut to move the worm gear axially. Turn the output shaft to confirm that there is no jamming in the rotation.

Use the lead pressing method to measure the thickness of the flattened lead wire between the bearing outer ring and the end cover, accurately calculate the remaining clearance, supplement the adjustment shims with corresponding thickness, and finally tighten the locking screw and lock nut to prevent loosening during operation.

‌3. Engagement linkage verification‌

Apply red red powder evenly on the tooth surface of the worm gear, manually turn the worm to drive the worm wheel to rotate, and observe the contact spots. Normal spots should be distributed in the middle of the tooth surface, slightly toward the direction of the worm rotation. The contact area accounts for ≥60% of the tooth length and ≥50% of the tooth height.

If the spots are offset, fine-tune the axial position of the worm or worm gear, and simultaneously correct the bearing clearances on both sides to avoid excessive meshing load due to excessive clearance on one side.

4. Final verification and confirmation

After the adjustment is completed, push and pull the worm and worm gear shaft axially. The measured axial movement must fall within the standard range. The entire shaft system must be rotated for more than 3 turns, and there shall be no jamming or abnormal noise throughout the process.

Run forward and reverse without load for 2 hours, and the temperature rise of the bearing shall not exceed 30°C. After the oil temperature is stable, the remaining clearance in the hot state shall be measured again and shall not be less than 60% of the lower limit of the cold state standard to avoid locking due to thermal expansion.

Latest News

WeiGao Transmission

Weigao Gear Reducer is an alliance group company that integrates research and development, production, sales, and service

+86 400 801 9158

Email: sales@wgt.net.cn;wgt.net.cn@gmail.com
Tel:+86571 85023000

WEIGAO REDUCER

FEEDBACK