WeiGao Transmission
Email: sales@wgt.net.cn
Language
通栏图2
tonglantu.jpg
Home / News / How to accept and hoist the reducer when it arrives: unpacking list, sling angle and positioning accuracy - Hangzhou Weigao Transmission

How to accept and hoist the reducer when it arrives: unpacking list, sling angle and positioning accuracy - Hangzhou Weigao Transmission

Author: Site Editor     Publish Time: 24-10-2026      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

From the time a reducer leaves the factory to the time it is installed, there is a period of transportation in between. Oil leaks, abnormal noises, and high bearing temperature rises that occur two or three months after the machine is started are often not caused by the assembly process, but on the day of arrival: the output shaft is covered by the sling, only two pieces of pad iron are inserted before grouting, the anchor bolts are screwed diagonally to the end at once, and the transportation plug of the ventilation cap is forgotten to be removed. These actions are very fast on site, but the rework is very slow.

Arrival acceptance and placement is a process with low cost and high profit in the whole life cycle of Let's go through the on-site actions in sequence: what to look at when unpacking, where the lifting points are, how to control the angle of the sling, how to lay out the shims, what accuracy should be achieved in alignment, the sequence of fastening and grouting, and how to assign responsibilities when cargo damage occurs.the reducer .

1. Unpacking and acceptance: packaging is the starting point of the evidence chain

Before unpacking, take a picture of the packaging: whether the wooden box dump mark has been turned over, whether there is condensation water in the moisture-proof film, whether the pallet has any traces of forklift penetration, and the box number and bill of lading number are kept in the same frame. The reducer is a cast iron part with an offset center of gravity. If it is dumped once, no external damage will be visible, but the internal gear set may have been impacted. After unpacking, check and sign item by item:

Acceptance items

Judgment criteria

Unqualified treatment

Box and joint surface

No bumps, cracks or rust spots, and the anti-rust grease is intact

Take photos and notify the supplier in writing. Self-polishing is prohibited.

input/output shaft extension

The shaft diameter and keyway are not damaged. The micrometer is retested according to GB/T 1800.1.

Minor bruises can be repaired with a whetstone, and replacement parts can be used if the difference is too high.

Oil seal and oil level

There are no flanging scratches on the lip; the horizontal oil level is at the center line of the oil mark, and the oil is not emulsified.

Traces of oil leakage are abnormal and need to be dismantled and inspected or the seal replaced.

Breather cap/oil plug

Make sure that the transportation plug and the ventilation cap are placed separately. The ventilation cap must be replaced before putting into operation.

If the plug is not removed before operation, the oil seal will leak if the internal pressure pushes it open.

Files and Attachments

Complete certificate, packing list, instructions, oil brand list; backstop, torque arm, and tightening sleeve set

Missing parts must be registered on the spot and the impact on the construction period must be confirmed in writing.

2. Nameplate verification: The model number is correct, but the installation location may not be correct.

The nameplate is more than just the core model and power. Speed ​​ratio, rated output torque, service factor, oil brand number, installation location code (M1~M6), factory number and manufacturing date, all six items must be consistent with the contract and drawings. The installation position code is often ignored : for the same horizontal reducer , M1 and M4 have two sets of oil level heights, breather cap positions, and bearing lubrication methods. If the order is M1 and the on-site installation is M4, the oil level will be low. The splash lubrication will not reach the high-speed bearing, and it will inevitably heat up within half a year. The factory serial number must be copied and filed separately, and it will be relied upon for subsequent checking of drawings, distribution of wearing parts, and warranty compliance.

3. Hoisting: lifting points, angles and three taboos

There is only one lifting point available - the lifting lugs or eye screw holes specially designed for the cabinet. The manufacturer's manual has very clear limits on the load-bearing capacity: the lifting lugs are only designed according to the weight of the complete machine (including the motor on the motor adapter), and no additional loading is allowed ; the lifting lugs on the motor, auxiliary reducer, and primary reducer cannot be used for lifting the complete machine. This is the most 'convenient' violation on site.

The angle of the sling directly determines the force on a single sling. For two symmetrical slings, T = G ÷ (2·cos(θ/2)), θ is the angle between the two ropes:

Angle θ

Single tension

10 t single root force of the whole machine

in conclusion

30°

0.52G

5.2t

nearly vertical lifting

45°

0.54G

5.4t

Most manufacturer"s manual limits

60°

0.58G

5.8t

Universal lifting operation upper limit

90°

0.71G

7.1t

The horizontal component force of the lifting lugs reaches 0.71 G, which is prohibited.

120°

1.00G

10.0t

A single root can bear the full weight. It is strictly prohibited to

When the angle is increased from 45° to 90°, the tension of a single rod only increases by 30%, but the horizontal component force endured by the lifting lug doubles, and the root of the cast iron lifting lug is the area where tensile stress is concentrated. Lengthen the sling or add a beam to bring the angle back to within 45°, which is more reliable than betting on the margin. Three taboos: Do not use wire ropes to directly cover the processing surface and joint surface (add nylon pads, and control the contact pressure within 2 MPa); do not lift the input shaft, output shaft, oil plug, oil sight glass, and torque arm; stop the lifting inspection 100~200 mm above the ground to confirm that the center of gravity is not deviated and the sling is not slipping before continuing to lift.

4. Leveling in place: rules for horns

The foundation concrete strength must reach more than 75% of the design value before it can be installed on the equipment. The surface should be chiseled and cleaned, and a grouting layer of 30~50 mm should be reserved. The pad irons are implemented in accordance with GB 50231: there are one set on both sides of each anchor bolt, 100~200 mm away from the bolt, and the distance between the groups is 500~1000 mm; each set should not exceed 3 pieces (one flat and two inclined), with thick pads underneath; the overlap of the inclined pad irons should not be less than 3/4 of the total length, and should be used in pairs; the insertion length of the 0.05 mm feeler gauge should not exceed 1/3 of the length of the pad irons; 10~30 of the flat pad irons should be exposed mm; spot welding between pads prevents displacement and must not be welded to the box.

The levelness is measured with a 0.02 mm/m precision level in two mutually perpendicular directions: the middle plane of the box and the upper plane of the base. 0.05~0.1 mm/m for normal working conditions, 0.02~0.05 mm/m for hard tooth surface heavy load and high speed grades. First perform initial leveling and then fine leveling. If the fine leveling is qualified, temporarily tighten the bolts. Re-test the level and alignment. If the leveling is qualified, grout again. After grouting, it must be loosened and re-tightened - the grouting layer will lift up by a few tenths of a millimeter when it solidifies. If you miss this step, you will get nothing.

5. Correction: double table method and allowable deviation

Level the tube box and align the two axes of the tube. Dial indicator double-meter method: One meter hits the outer circle of the driven coupling to measure the radial direction, and the other meter hits the end face to measure the angular direction. The two axes rotate synchronously, and the reading is the difference between the upper and lower limits. Rigid coupling radial direction ≤ 0.02 mm; elastic coupling radial direction ≤ 0.05 mm, angular direction ≤ 0.03 mm/100 mm. 0.05~0.15 mm thermal compensation is reserved for hot equipment, and the direction is toward the motor side. The adjustment should always be made to the rear-mounted side - the motor or load equipment. Do not touch the grouted reducer ; tightening the anchor bolts itself will cause a displacement of 0.01~0.03 mm, and retesting is required after adjustment.

6. Fastening and grouting: Sequence is more prone to errors than torque

Cross the anchor bolts diagonally and tighten them in 2 to 3 times, with each step increasing to 50%, 80%, and 100% of the target value. Level 8.8 reference pretightening torque: M12 is about 60~90 N·m, M16 is about 150~210 N·m, M20 is about 300~410 N·m, M24 is about 520~700 N·m. The reduction is 15%~20% after the thread is greased. The manufacturer"s manual shall prevail. Expose 2~3 teeth of the nut, add a flat spring washer, and place thread locking glue on important work stations. For the secondary grouting, micro-expanded fine stone concrete of C35 or above is used. It is filled once and is vibrated, and cured for no less than 48 hours. After the strength reaches 75%, re-tighten and re-test the level and alignment. No-load test run for 2 hours, the oil pool temperature does not exceed 75 ℃, the bearing temperature does not exceed 85 ℃, and the vibration intensity is determined according to the corresponding power level of ISO 10816-3.

7. Category III Arrival Damage and Division of Responsibilities

The first type is transportation bumps, which are characterized by box edges, flange edges, and lifting lug roots. The judgment depends on whether the damaged location of the package matches the bump direction; the second type is shaft extension corrosion, mostly due to the sea salt spray and anti-rust grease that is too thin. If the rust pit exceeds 0.02 mm, surface treatment cannot be done; the third type is oil seal oil seepage. The leakage upon arrival is due to assembly or oil seal quality and has nothing to do with transportation. Timeliness is the key: Damage to sea freight should be reported to the carrier in writing within 3 days from the day after receipt of the goods, and the overdue bill of lading record is regarded as preliminary evidence of delivery; insurance claims generally require reporting the damage within 30 days after the loss is discovered, and attaching photos, packing lists, bills of lading, and inspection records.

Taken together, the arrival acceptance of the reducer is an executable, signable, and traceable record: packaging photos, five-item inspection list, nameplate transcript, lifting plan, horn and level readings, alignment data, grouting maintenance records, and no-load test run curve. When Hangzhou Weigao Transmission delivers hard-tooth surface reducers, cycloidal pinwheel reducers, worm gear reducers and gear reduction motors, it comes with nameplate parameter tables, lifting point diagrams and alignment tolerance tables. It can issue a positioning plan and make Selection calculations based on the basic conditions on site. The oil level and ventilation configuration of each installation position of M1~M6 must be confirmed before ordering. If you have any questions about arrival acceptance or replacement of Selection, please send the nameplate photos and basic drawings, and we will do a free parameter check.

Latest News

WeiGao Transmission

Weigao Gear Reducer is an alliance group company that integrates research and development, production, sales, and service

+86 400 801 9158

Email: sales@wgt.net.cn;wgt.net.cn@gmail.com
Tel:+86571 85023000

WEIGAO REDUCER

FEEDBACK