CWU63-6.3-Ⅲ is a small arc cylindrical worm reducer. After the journal is repaired (such as spraying, repair welding, brush plating, inlaid sleeve, etc.), the standard running-in time is recommended: 2 to 4 hours without load, 8 to 16 hours with light load, and the total running-in is not less than 10 to 20 hours, then it can run normally with rated load.
Specific running-in process
1. No-load running-in (2~4h)
Start it for the first time after repair, run continuously without load, and observe the oil temperature, noise, vibration and sealing for leaks. The temperature should gradually rise and stabilize.
2. Light load running-in (8~16h)
Load to 30% to 50% of the rated load and run continuously. At this stage, the main purpose is to gradually fit the mating surfaces of the shaft, bearing and oil seal to avoid excessive local stress.
3. Gradually load
After light-load running-in without abnormality, gradually increase the load to full load in 2 to 3 times, and run for 2 to 4 hours each time. After confirming that the temperature rise, noise, and sealing are normal, it can be put into normal use.
Things to note
If the repaired shaft has been welded, sprayed, etc., it must be cooled to room temperature before assembly to prevent secondary wear caused by thermal deformation.
During the running-in period, the oil temperature should not exceed 70°C. If it is too high, the machine should be stopped to check the coaxiality, lubrication and assembly tightness.
After running-in, it is recommended to check the oil quality and replace the lubricating oil if necessary to avoid wear debris from exacerbating internal wear.
Failure warning technology of rice mill reducer: realizing preventive maintenance
Lightweight design and convenient maintenance of small rice mill reducer
How does the cutter reducer solve the torque bottleneck of heavy-duty cutting of servo motors?
What impact does installation deviation have on the output shaft of R series gear reducer?
What specific faults will the installation deviation cause in the R series reducer?
The hidden impact of the lubrication method of the cutting machine reducer on the life and accuracy
How to determine the installation direction of ZSY gear reducer backstop
What are the specific consequences if the backstop of the ZSY reducer is installed upside down?
How to solve the problem of broken shaft of planetary reducer
Is the reducer noisy? Find the reasons from gear modification to box design
Full analysis of lathe reducer installation: misalignment is an accuracy killer!
What are the steps to adjust the oil level of DCY gear reducer?
What are the fracture characteristics of fatigue fracture of ZSY reducer spline shaft?
How to replace the internal parts of WB micro cycloidal reducer
How to judge whether the arm bearing of WB micro cycloid reducer needs to be replaced
Three major causes of overload failure of palletizer reducer
How to reduce the impact of low temperature environment on SAF series reducer
Do KAF series reducer bearings need special protection in low temperature environments?
Idle storage and restart operation and maintenance specifications of sizing machine reducer
The hidden impact of speed ratio matching of sizing machine reducer on yarn quality
What are the key points for disassembly and inspection of ZL35 soft tooth surface gear reducer?
Is the temperature of the granulator reducer too high and the power insufficient?