Key operating points when assembling ZQ reducer
Publish Time: 2021-11-26 Origin: WGT
Reducer equipment is one of the indispensable equipment in industrial production.When designing reducers, manufacturers have designed different types of reducers according to the needs of different industries.Today, let us first understand the main requirements of the ZQ reducer during the assembly process:
1. ZQ reducer parts can be installed after cleaning.
2. In assembly order, we can run in reverse order of disassembly.
3. During the assembly process, the surface of rolling or sliding parts should be coated with lubricating oil to form preliminary lubrication conditions.
4. When the cycloidal wheel is installed, please install it according to the position of the prefix when removing the dismounted position.
5. When the output shaft is installed in the base, it is allowed to hit the recess with a red copper rod, but not with a hammer.
6. When the output shaft pin is inserted into the corresponding hole with the cycloid gear, please pay attention to the position of the spacer ring, and fix the position with a pin sleeve to prevent the spacer ring from being crushed.
7. For the oil-resistant rubber sealing ring, we should pay attention to adjust the tension of the spring and apply grease.
8. The bearings of the ZQ reducer can be installed by heating.
9. The sealing paper on the joint surface should be renewed.
10. After assembling the ZQ reducer, the high-speed input shaft can be rotated by hand.It should rotate flexibly without friction interference.
I hope you can understand the assembly point of ZQ reducer equipment.If you encounter any problems in the process of using the equipment, you can consult us.